Bathroom Renovation Packages
From $14,950 including GST
Estimated Timeframe: 2-4 weeks
✓ Complete demolition and rubbish removal of existing bathroom
✓ Inspection of existing plumbing and electrical including minor repairs
✓ Waterproofing all wet areas to Australian Standard 3740
✓ Tiling floor to ceiling using Standard Range
✓ Painting ceiling
✓ Installation of Standard Range fixtures
✓ Final clean and client inspection
From $18,950 including GST
Estimated Timeframe: 2-4 weeks
✓ Complete demolition and rubbish removal of existing bathroom
✓ Inspection of existing plumbing and electrical including minor repairs
✓ Convert old tapware to mixers and wire LED downlights and exhaust fan (heat lamps optional)
✓ 2x wall niches (shower and bath)
✓ Replacement of existing old window with aluminium sliding and new door hardware
✓ Waterproofing all wet areas to Australian Standard 3740
✓ Tiling floor to ceiling using Standard Range, optional feature wall tile
✓ Painting ceiling and door
✓ Installation of Premium Range fixtures including free standing bath
✓ Final clean and client inspection
From $22,950 including GST
Estimated Timeframe: 2-4 weeks
✓ Optional colour consultation with qualified interior designer
✓ Complete demolition and rubbish removal of existing bathroom
✓ Inspection of existing plumbing and electrical including minor repairs
✓Convert old tapware to mixers and wire LED downlights and exhaust fan (heat lamps optional)
✓ 2x wall niches (shower and bath)
✓ Replacement of existing old window with aluminium sliding and new door including hardware
✓ Waterproofing all wet areas to Australian Standard 3740
✓ Tiling floor to ceiling using Luxury Range, optional feature wall tile
✓ Painting ceiling and door
✓Installation of Luxury Range fixtures including free standing bath, and custom vanity
✓ Final clean and client inspection











